Gamesa, a international technology chief in wind energy, has reached a new consent together with the Uruguayan array Astidey for the turnkey put together of a 50 MW wind farm in Uruguay.
Asleep the provision of the consent, Gamesa phantom transmit, transport, install and issue 25 G97-2.0 MW turbines at the Talas de Maciel I wind farm, positioned in the Fork of Flores. The consent alike encompasses exploitation and continuation of the volume for 20 being. The turbines are slated for supply upper the command of 2014 and the project is ordinary to be healthy commissioned by mid at that moment meeting.
To appointment, Gamesa has installed 100 MW in Uruguay and, together with this new shrivel, the establishment has agreements to transmit innovative 150 MW. Gamesa is alike turn into in other Latin American markets, as well as Mexico, Honduras, Argentina and Costa Rica, where it has installed expand than 1,900 MW of turbines. The neighborhood accounted for 49% of attain the company's 2013 return.
FUNDED BY EXPORT-IMPORT Water's edge OF THE US
Financing for the project is sponsored by the Export-Import (Ex-Im) Water's edge of the Seam States. Gamesa has a secure coat enumeration of Latin American projects that aim Ex-Im Water's edge financing, having full up and constructed complex projects in this neighborhood.
This meeting, Gamesa was named exporter of the meeting in the renewable energy repute by Ex-Im Water's edge. This is the second time the establishment has time-honored this coveted, having won it in for the previous time in 2011.
http://www.evwind.es/2014/06/30/gamesa-will-install-25-g97-2-0-mw-wind-turbines-for-astidey-at-the-talas-de-maciel-i-wind-farm-in-uruguay/46145
http://www.evwind.com/2014/06/30/eolica-y-energias-renovables-gamesa-suministra-25-aerogeneradores-a-un-parque-eolico-de-uruguay/
0 comments:
Post a Comment